This water utility project was done in Southern Arizona. This wastewater plant upgrade work consisted of providing and installing:
A New Control Panel for the hydrostatic tank
Ductile piping layout and fabrication with flanges
Valve specification and installations
Boost pump controls, pads, supports and necessary equipment