Author Archives: Robert Doenges

Water Utility Project

This water utility project was done in Southern Arizona. This wastewater plant upgrade work consisted of providing and installing: A New Control Panel for the hydrostatic tank Ductile piping layout and fabrication with flanges Valve specification and  installations Boost pump controls, pads, supports and necessary equipment